Recurrence without guesswork.
Keep the date rule, the next occurrence, and the deadline separate.
Choose the rhythm
Use daily, weekly, or monthly recurrence when that matches the actual operating need. Use Manual for work that starts by explicit decision. An interval changes the distance between occurrences.
Explain the date basis
The current pilot uses UTC calendar dates, not local times of day. The occurrence date identifies the scheduled cycle. Grace days set the run’s due date after that occurrence.
Handle month boundaries
A monthly schedule anchored on the 31st uses the last available day in a shorter month, then returns to the anchor in later months. This avoids silently shifting the recurring rule after February.
Review missed work
The scheduler catches up in bounded batches instead of creating an unlimited backlog at once. An operator should review late occurrences and capacity limits rather than assume that generation means the work was performed.